Product overview
Dayu®Non-curing rubber asphalt waterproof coating is a new type of hot melt asphalt waterproof coating with environmental protection and long-term creep.
Its cohesion is very low, the film shape is not fixed, and it always maintains the characteristics of viscous glue, so it has a strong self-healing ability and adaptability to deformation.
Product Features
l Keep the creep state for a long time, and the damage can be self-healing and reclosed.
L low cohesion, can release and dissipate the stress transmitted to the coating, the coating is not cracked, not affected by zero extension side effects, no fatigue damage.
l Strong bonding ability, can be well bonded with the base and a variety of coiled materials, and form a composite waterproof layer with strong waterproof ability.
l Good sealing, solve the problem of water channeling.
L high solid content, no solvent, can be a thick coating to more than 2mm.
l Construction environment adaptability, hot melt construction is not limited by temperature.
L anti-loss, corrosion resistance, good durability.
Scope of application
l It is suitable for industrial, civil, municipal and other construction projects, including administrative, residential, commercial, scientific research, medical, school, grain depot, pipe gallery and other buildings.
l Suitable for building basement, roof and other waterproof parts.
L suitable for gap grouting plugging maintenance engineering.
Construction process
L non curing rubber asphalt waterproof coating can not exist alone, and need to be combined with waterproof coiled material, sheet or geotextile cloth and other cladding materials.
L grass-roots requirements: solid, dry, clean, free of sediment, laitance, no empty drum, loose, sand and other phenomena, yin and yang angle should be rammed arc angle.
l Interface treatment: uniform spray (roll) coating matching base treatment agent, improve the coating and the adhesion of the base.
L trial laying of coiled material: lay the coiled material flat on the base surface, align the elastic line or the overlapping edge of adjacent coiled material, adjust the overlapping width *, let stand for a period of time to release the stress and then roll back.
Lap width: determine the lap width according to the selected waterproofing membrane.
L hot melt coating: place the coating barrel in the debarrel and heat it, so that the outer wall of the block coating melts and does not stick to the barrel wall; Pour the block in the barrel into the melt glue machine and fully heat it to a molten state.
l Scraping or spraying the molten coating to the base surface shall reach the design thickness once and shall not pollute the lap edge of the coil.
l Simultaneously pave the surface coil, properly compacted to make the coil and the coating closely combined.
L coil overlap: the coil should be overlapped in body, and non-curing paint should not be used for bonding.
performance index
Products in accordance with the building materials standard "non-curing rubber asphalt waterproof coating" JC/T2428-2017 manufacturing.
Performance indicators meet standard requirements
Part of the physical performance indicators at a glance:
Project |
Indicators |
Flash Point |
≥ 180 ℃ |
Solid content |
≥98% |
Bonding performance |
100% cohesive failure |
Extensibility |
≥ 15mm |
Low temperature flexibility |
-20 ℃, no crack |
Heat resistance |
65 ℃, no sliding, flowing and dripping |
self-healing |
No water seepage |
stress relaxation |
≤ 35% |
Anti-channeling water |
0.6MPa, no water channeling |